Set the acq_time=6 (as in v7).
Fix large pixel calib for T=-36°C. The fix is based on IFTP data from
July 4 to July 20 with acq_time=6 and acq_time=1.
For each IX a rought estimate was obtained for the shift of the pedestal
and the 160keV pulser peaks. The shift was applied to all large pixels.
Set the acq_time=6 (as in v7).
Fix large pixel calib for T=-36°C. The fix is based on IFTP data from
July 4 to July 20 with acq_time=6 and acq_time=1.
For each IX a rought estimate was obtained for the shift of the pedestal
and the 160keV pulser peaks. The shift was applied to all large pixels.