The following schematic design process is applied to \acs { ETPH} 's space related projects.
2023-05-25 15:52:46 +00:00
\begin { enumerate}
\item Mission requirements review.
2023-05-26 10:03:36 +00:00
\item Identifying critical design drivers. (In most cases the detectors.)
\item Whiteboard Brainstorming: Detector arrangement (the telescope).
\item Initial \acs { GEANT4} modeling and iteration.
\item Intermediate telescope model freeze. \newline $ \rightarrow $ Important to synchronize parallel activities and come to a mutual consensus between the different technical fields. \newline $ \rightarrow $ Lab breadboarding activities start here.
\item Electronics infrastructure\ area allocation (channel count/ board space).
2023-06-13 13:31:32 +00:00
\item Implement structural/ thermal requirements on a conceptual level.
2023-05-26 10:03:36 +00:00
\item Conceptual functional elements' arrangement (the initial chassis design concept). Activities supported by preliminary CAD studies (to-scale 'lego-bricks').
2023-05-25 15:52:46 +00:00
\begin { enumerate}
2023-05-26 10:03:36 +00:00
\item Refining accommodation constraints, e.g. max. lengths of signal lines, shielding, viewing direction, symmetries, ...
2023-05-25 15:52:46 +00:00
\item Refine structural considerations, applicable I/F requirements.
\end { enumerate}
2023-05-26 10:03:36 +00:00
\item Setup of initial full-featured CAD model with to-scale functional elements.
\item Iterate \acs { GEANT4} telescope simulation.
\item Detailed conceptual telescope setup freeze. \newline $ \rightarrow $ At this point all technical details of the telescope are finalized.
\item Refine handling and composability (assembly concept) considerations followed by CAD implementation.
2023-05-25 15:52:46 +00:00
\begin { enumerate}
2023-06-13 13:31:32 +00:00
\item PreAmp/ Shaper accommodation.
2023-05-25 15:52:46 +00:00
\item Detailed telescope design.
2023-05-26 10:03:36 +00:00
\item PCB accommodation and wiring concept.
2023-05-25 15:52:46 +00:00
\end { enumerate}
2023-05-26 10:03:36 +00:00
\item Inital \acs { SMM} and \acs { TMM} runs.
\item Implementing findings from breadboarding activities, simulation runs, detailing CAD modling.
2023-05-25 15:52:46 +00:00
\item Detailed instrument design.
\end { enumerate}